Course Solutions Uncategorized Following Material Planning System Technique Mrp B Mrp Ii C Jit D Erp E None Q34233710

Following Material Planning System Technique Mrp B Mrp Ii C Jit D Erp E None Q34233710

Which of the following is not a Material PlanningSystem/Technique?

a) MRP

b) MRP-II

c) JIT

d) ERP

e) None of the Above

Expert Answer


The correct answer is (c) JIT.

JIT stands for Just-In-Time which is just a lean principle. Thisis not a Material Planning System/Technique.

Leave a Reply

Your email address will not be published. Required fields are marked *

Related Post

(Solved) : Explain Methods Used Pandas Nosql Dataframes Store Manipulate Big Data Determine Schemes F Q31172601 . . . .(Solved) : Explain Methods Used Pandas Nosql Dataframes Store Manipulate Big Data Determine Schemes F Q31172601 . . . .

<p>Explain the methods used by Pandas NoSQL dataframes to store andmanipulate big data.</p><p>Then Determine how such schemes facilitate Creation (Insertion),Retrieval (Queries), Update (Edits) and Deletion (Removal)operations on stored data (collectively