<p>5. Develop Witness simulation model from the flowchart in theprevious problem (See Pictuer). Assume normal distributions.</p><p>Activity</p><p>Cycle Time</p><p>Cycle Time Standard Deviation</p><p>Labor</p><p>Load casting</p><p>Batch of 3 every 5 minutes</p><p>Machine flange</p><p>17.53</p><p>2.3</p><p>1</p><p>Inspect</p><p>4.75</p><p>0.67</p><p>1</p><p>Transfer</p><p>Speed=1, capacity=3</p><p>Drill 5 holes</p><p>12</p><p>2.6</p><p>Tap