Course Solutions Uncategorized Compute Multifactor Productivity Measure Weeks Shown Production Chocolate Bars Assume 40 H Q34298670

Compute Multifactor Productivity Measure Weeks Shown Production Chocolate Bars Assume 40 H Q34298670

Compute the multifactor productivity measure for each of theweeks shown for production of chocolate bars. Assume 40-hour weeksand an hourly wage of $16. Overhead is 1.5 times weekly labor cost.Material cost is $9 per pound. (Round your answers to 2 decimalplaces.) Week Output (units) Workers Material (lbs) 1 30,000 5 4502 35,000 7 500 3 30,000 7 500 4 40,000 7 600 Week MFP (Output /Total Cost)

1

2

3

4

Expert Answer


Wage per worker = 40×16 =640

WeekOutputWorkersLabour costOverheadMaterialMaterial costTotal cost130000532004800450405012050235000744806720500450015700330000744806720500450015700440000744806720600540016600

MFP = Total output / total cost

= 135000/60050 = 2.248

Leave a Reply

Your email address will not be published. Required fields are marked *

Related Post

(Solved) : Java Sandbox Allows Program Create Class Loader True B False Java Classes Checked True B Q26172173 . . . .(Solved) : Java Sandbox Allows Program Create Class Loader True B False Java Classes Checked True B Q26172173 . . . .

<p><strong>In Java, the sandbox allows a program to create a classloader.</strong><br/>    a. true<br/>    b. false<br/><br/><strong>In Java, all classes are checked.</strong><br/>    a. true<br/>    b. false<br/><br/><strong>Cryptography is fundamental to security in distributedsystems.</strong><br/>    a. true<br/>    b. false<br/><br/><strong>Formally speaking, verifying