A product requires four steps A > B > C > D. One worker is assigned to each step and activity time for these steps are 9 minutes, 15 min, 18 mins, and 10 min respectively. Each worker works for 450 mins/day. Assume steady state.
QUESTION 8
A product requires four steps, A, B, C and D. Two alternative paths exist for steps B and C, thus in the figure below B1 and B2 refer to two possibilities to complete step B, and C1 and C2 refer to two possibilities to complete step C. The total number of operators in the process