PS.73 Free Oldies is a small company that burns music CDs fornon-technical senior citizens. The table below contains informationon the steps required to burn and package a CD. (Their equipment isquite old, hence, the long burn time.) In order to meet demandrequirements, they need to have a cycle time no longer than 35minutes.
Task Description Req’d Time (in minutes) PredecessorASet up equipment15NoneBTest equipment15ACSelect songs30NoneDBurn CD20B, CEPackage CD5D
A. What is the total time (in minutes) to produce one CD?
B. Which tasks should you assign to workstation 1? (In the fieldbelow, write the number that corresponds to your answer.
B and C
C and D
A and B
C and
PayPal Gateway not configured
PayPal Gateway not configured