This is one part of our HVAC project:
The building is constructed on a sloping ground and the floor ofthe building at the front of the building is located (southernside) at an altitude of 80 cm from the street level and the northside is level with street.
We are doing our project with Carrier software
the problem is how we should apply slope(80 difference) isCarrier software?
Expert Answer
An answer will be send to you shortly. . . . .