Consider the activty list in the table below. All durationestimates or estimated times are in days.
Draw an AOA network diagram representing the project. Thenetwork should proceed from Node 1 to Node 9. Put the node numbersin circles and draw arrows from node to node, labeling each arrowwith the activity letter and estimated time.
Identify all of the paths on the network diagram and note howlong they are.
What is the critical path for this project and how long isit?
What is the shortest possible time needed to complete thisproject?
Activity Initial Node Final Node Estimated DurationA121B233C241D252E362F464G573H683I671J787K894