B. Fill in the following parts. Recall that AMAT = Hit Time +Miss Rate * Miss Penalty. (4 point)
i. Assume Hit Time is 1 cycle and the miss penalty is 100cycles. What should be the value of the
miss rate to achieve an AMAT of 2 cycles? (1 point)
ii. As in (a.) but now assume the miss penalty is 800 cycles.What is the miss rate needed to achieve
an AMAT of 2 cycles? (1 point)
iii. Assume a two-level cache where the L1 hit time is as in(a.) and the hit time in the L2 cache is 2
cycles and the miss penalty is