1) At the following network, 900 cars are going from node to node 6 per hour. The values on arcs are maximum number of cars t1) At the following network, 900 cars are going from node to node 6 per hour. The values on arcs are maximum number of cars that can use the arc per hour and average time to traverse the are respectively. Find minimum total time for the travel of 900 cars by using capacitated network simplex method. 2-600, 30-4 800, 10 100,70 400, 60 6 )-900 600, 30 900 300, 10 600, 30