Sigma Electronics produces telephone cameras for cell phone. Theproduction manager would like to create an MRP for their cell phonecameras with a minimum cost possible. The following table showgross requirements of the product. Develop a Part Period Balancing​(PPB) solution and calculate the total relevant costs for theMRP.

                                                                                                                                   

Period

1

2

3

4

5

6

7

8

9

10

11

12

Gross requirements

30

40

40

70

20

10

70

40

​Also, for this plan the Holding

costequals=​$2.50/unit/period;

setup

costequals=​$200​;

lead

timeequals=1

​period; beginning

inventoryequals=40

units.

Use the table below to develop a PPB solution for MRP ​(enteryour responses as whole​ numbers).

Period

1

2

3

4

5

6

7

8

9

10

11

12

Gross requirements

30

40

40

70

20

10

70

40

​On-hand at beginning of period

40

​On-hand at end of period

Order receipt

Order release

The total relevant cost is​ =

​$

​(enter your response as a whole​ number).

Expert Answer


Answer:

Table Prepared in MS Excel

Considering Lead Time =