Course Solutions Uncategorized Manager Checked Production Records Found Worker Produced 195 Units Working 50 Hours Previo Q34298634

Manager Checked Production Records Found Worker Produced 195 Units Working 50 Hours Previo Q34298634

A manager checked production records and found that a workerproduced 195 units while working 50 hours. In the previous week,the same worker produced 140 units while working 40 hours. a.Compute Current period productivity and Previous periodproductivity. (Round your answers to 2 decimal places.) Currentperiod productivity Units / hr Previous period productivity Units /hr b. Did the worker’s productivity increase, decrease, or remainthe same? (Round your intermediate calculations and final answer to2 decimal places. Omit the “%” sign in your response.) Worker’sproductivity by %

Expert Answer


Answer

* Current period productivity=output/input

=195/50

=3.9

* Previous pariop productivity

= 140/40

= 3.5

* Productivity change

=(current productivity-old productivity)/old productivity

=(3.9-3.5)/3.5

=0.11

Therefore, the worker’s

OR

PayPal Gateway not configured

OR

PayPal Gateway not configured

Leave a Reply

Your email address will not be published. Required fields are marked *

Related Post

(Solved) : 04 Problems Encryption Techniques Aes 1 Given Message Canadian University Dubai Key Lollyp Q31311410 . . . .(Solved) : 04 Problems Encryption Techniques Aes 1 Given Message Canadian University Dubai Key Lollyp Q31311410 . . . .

<br/><img src="https://media.cheggcdn.com/media%2F612%2F612e98c1-05f3-4274-b453-7f1f401f2824%2Fimage" alt="04 Problems on Encryption Techniques and AES 1. Given the message CANADIAN UNIVERSITY DUBAI, and the key LOLLYPOP use 12 points the Vigenère Cipher to generate a ciphertext