(Answered) : You make steering wheels for Tesla using Kanban cards to authorize movement of incoming parts. In one portion of the system, a

You make steering wheels for Tesla using Kanban cards to authorize movement of incoming parts. In one portion of the system, a work center uses an average of 120 parts per hour while running. The manager has assigned an inefficiency factor of 0.22 to the center.

Standard containers are designed to hold 4 dozen parts each. The cycle time for parts containers is 105 minutes.

How many containers are needed?

Your Answer:

Expert Answer


Usage of work center per hour = 120 parts

Inefficiency factor = 0.22 for the center

Hence, effective usage of work center for design purpose = 120 /

OR

PayPal Gateway not configured

OR

PayPal Gateway not configured

Leave a Reply

Your email address will not be published. Required fields are marked *

Related Post

(Solved) : Consider Following Four Transactions Transaction T1 Readitem Readitem D Writeitem D Transa Q27986249 . . . .(Solved) : Consider Following Four Transactions Transaction T1 Readitem Readitem D Writeitem D Transa Q27986249 . . . .

<p><strong>Consider the following four transactions:</strong></p><p>*Transaction T1: read_item(A); read_item(D); write_item(D);</p><p>*Transaction T2: read_item(B); write_item(B); read_item(D);write_item(D);</p><p>*Transaction T3: read_item(C); write_item(C);</p><p>*Transaction T4: read_item(D); write_item(D); read_item(A);write_item(A);</p><p><strong>Following is a log corresponding to a particularschedule at the point