You make steering wheels for Tesla using Kanban cards to authorize movement of incoming parts. In one portion of the system, a work center uses an average of 120 parts per hour while running. The manager has assigned an inefficiency factor of 0.22 to the center.
Standard containers are designed to hold 4 dozen parts each. The cycle time for parts containers is 105 minutes.
How many containers are needed?
Your Answer:
Expert Answer
Usage of work center per hour = 120 parts
Inefficiency factor = 0.22 for the center
Hence, effective usage of work center for design purpose = 120 /