In the text and the lecture, two types of workstations arecovered at the Briar Patch Manufacturing company. One machine theTortoise 2000 had frequent but short outages while the othermachine the Hare X19 machine had rather infrequent outages, butquite long. How would you convince your production manager thataccording to the Factory Physics’ analysis the machine with thefrequent but short outages is preferable to the one with infrequentbut long outages, provided the availabilities are the same?Obviously, the production manager wants to run the machine as longas possible. Is he/she right or wrong and how do you handle if youare the maintenance engineer?
PayPal Gateway not configured
PayPal Gateway not configured