Course Solutions Uncategorized (Answered) : Target Stream Value Stream Actions Required Bring Product Production Stream Design Stream Q30939094

(Answered) : Target Stream Value Stream Actions Required Bring Product Production Stream Design Stream Q30939094

TargetStream

ValueStream

Actions required tobring a product through the production stream, and, the designstream.

The designflow – from launch to concept

Theproduction flowfrom raw material to thecustomer

GeneralAdministrative Costs ——————–> Determining consumerneeds ———-> Service support

Order—–> Manufacturing Labour & Load——–> Distribution & Installation —-> Duties &Tariffs

Engineering

Procurement& Transportation ————-> Materials

(ForPharmaceutical industry – Lower Cost of Goods Sold)

Target costing isfor direct comparison to Cost of Goods Solved. Full stream targetcosting takes into account most likely, and, worst case supplychain scenarios.

ValueStream Mapping

Lean manufacturing is associated with production flow

Customer demand——-> raw material —————–> Product &waste

Waste

OR

PayPal Gateway not configured

OR

PayPal Gateway not configured

Leave a Reply

Your email address will not be published. Required fields are marked *

Related Post