Consider the following three-station production line with asingle product that must visit stations 1, 2, and 3 insequence.

  • Station 1 has 3 identical machines with an average processingtimes of 5 minutes per job
  • Station 2 has 10 identical machines with an average processingtime of 20 minutes per job.
  • Station 3 has 4 machines with average processing times of 3minutes per job.

  1. How long does it take for a product to go through the entireproduction line? (.5 points)
  2. What is the cycle time of each station? (.5points)
  3. What is the bottleneck rate for the production line and whatstation is it? (1 point)
  4. Compute w0 for