
Question 3 20 points A tandem assembly line consists of four workers and a single product (equivalent to the paper aircraft simulation An industrial engineer decides to analysis this system by measuring started time, Completed time, and processing time of each product as shown in the following table Product ing time (minutes) time Note Typetim Wor 6.8 5.8 8.6 5.2 4.2 8.7 6.6 11.7 10.0 9.3 8.3 8.4 6.9 9:01 10:10 defect 10:26 19.2