Question 1 A company is producing chairs. To produce one chair in Workstation A, 4 metal bars are required. In each 12-hour work day, Workstation A produces 480 chairs. Metal bars are produced in Workstation B. Workstation A and B are located in different areas of the plant and a two card pull system is used. The information about production and moving metal bars is shown below; . Container Size: 120 units Conveyance o Total wait time: 2.5 hours o Total move time: 1 hours Production o o o Total wait time: 0.75 hours Setup time: 0.9 hours/container Processing time:
PayPal Gateway not configured
PayPal Gateway not configured