Problem 4: A manufacturing facility produces 5 components. The components 1, 2 and 3 are of equivalent size and weight. The component 3, whereas the component 5 is just half size of the components 1, 2 and 3. Facility includes departments A, B, C, D, E and F and the overall flow path is A-B-C-D-E-F. The quantities to be produced and the routing for each component are given below. Develop a From-To Chart for this facility
PayPal Gateway not configured
PayPal Gateway not configured