b) The network for a ship maintenance project is as shown and the time estimate is table. shown in th Network information ACTIVITY -Variance 1.00 0.00 0.11 3.36 1.00 0.11 1.00 0.11 1.78 IB e-(a+4.1n+b)/61 σ2 9 6.00 4.00 12.00 6.17 6.67 8.00 8.33 4.00 6.00 13 14 7 12 4 12 Expected duration (Te)- (a-4.mtb) /6 Variance of duration (sd 2 - (b-a) A2/36 Following are the possible paths and their corresponding expected durations(by adding up Tes Of corresponding activities A-B-E-H-6 + 4 + 6.67 + 40 = 20.67 A-B-F-H-6+8+4022 A-C-F-H = 6+12+844-24, 177 A-D-F-H--6+6.17+/+4-24.17 A- D-G I 6+6.17+8+6+ 8.33 OUT OF ABOVE, PATH A,C,F, has the longest duration of 30 sand hence forms the critical path, Since the case will be 30. project completion time is same as duration of critical path, the project completion time in this

what

OR

PayPal Gateway not configured

OR

PayPal Gateway not configured

Leave a Reply

Your email address will not be published. Required fields are marked *

Related Post