ne manuracturing of & ClOCk iS Comprised Of SX Steps.Bach Step Is Starred by one Worke he tabile shows the tasks peformed by cach worker and the corresponding processing time Processing Time 1 Heat-stake lens to bezel 2. Inspect bezel 3. Clean switch holes 14 26 Install set switch in bezel Total time for A 18 68 23 5.Check switch travel 6.Clean inside bezel Preparation 2 25 60 7. Install module in bezel Total time for B 8. Install battery clip on module 9. Heat-stake battery clip on module 10. Install two batteries in module 1. Check switch Total time
PayPal Gateway not configured
PayPal Gateway not configured