Course Solutions Uncategorized (Answered) : In an MRP problem, A is an MPS item. Every A requires 2 B’s and 3 C’s. Every B requires 5 C’s. All lead times are two periods. I

(Answered) : In an MRP problem, A is an MPS item. Every A requires 2 B’s and 3 C’s. Every B requires 5 C’s. All lead times are two periods. I

In an MRP problem, A is an MPS item. Every A requires 2 B’s and 3 C’s. Every B requires 5 C’s. All lead times are two periods. Initial inventory values for A is 100, B is 200 and C is 0. Use lot-4-lot method for order quantities for all items. If gross requirement for A is 800 in period 9, what will be the planned order release for B in period 5?

a.1600

b.1400

c.700

d.800

e.1200

Expert Answer


The MRP’s for item A and B are as follows

Item

A

Week

1

2

3

4

5

6

7

8

9

Lot Size

L4L

Gross Req.

800

Lead time

2

Scheduled Receipt

POH

100

Projected on hand Inv

100

100

100

100

100

100

100

100

0

SS

0

Net requirement

800-100

= 700

Planned order receipt

700

Planned order release

700

Each A

OR