2. Public Garden IDActivit A |Design Time Sequence None Layout C Walkway D Lighting E Irrigation FFence and Wa7B G Plantin 7 B a. Construct Gantt chart b. Draw CPM/PERT network and c. Find slack if any? d. If each activity needs a staff and we have only two staff how to do the scheduling? Draw the resource graphic and revised Gantt chart?2. Public Garden IDActivit A |Design Time Sequence None Layout C Walkway D Lighting E Irrigation FFence and Wa7B G Plantin 7 B a. Construct Gantt chart b. Draw CPM/PERT network and c. Find slack