Question Description
Term Paper Brief
- A) Select ONE ONLY of the following projects ▪ The Channel Tunnel Rail Link (HS1) (NOT the Channel Tunnel Project)
- ▪ London Heathrow Terminal Five
- ▪ The 2012 London Olympics
- ▪ The Boston Central/Artery Tunnel (The “Big Dig”) (Boston MA, USA)
- ▪ Thames Tideway Tunnel
- ▪ Crossrail
- ▪ High Speed Two (HS2)
- ▪ Three Gorges Dam (People’s Republic of China)
- ▪ Another large project or programme approved by the Module Leader.
- B) Briefly describe the project and demonstrate using available literature: the key challenges of the project/programme and its management noting in particular any aspect
OR
PayPal Gateway not configured
ORPayPal Gateway not configured