Which of the following layouts satisfies the preferences displayed in the attached Muther’s Grid? (***NO GRID ATTACHED***)
The Henry Street Mission uses volunteers to assemble care packages for needy families during the holiday season. The mission would like to organize the work as efficiently as possible. A list of tasks, task times, and precedence requirements are given below. (Hint: balance the line before answering this question).
Task Precedence Time (mins)
A — 6
B A 3
C B 7
D B 5
E C, D 4
F E 5
If volunteers are plentiful, what is the maximum possible number of packages that can be assembled in an 8-hr day? (hint: ignore the desired cycle time; the output is limited only by the constraints
PayPal Gateway not configured
PayPal Gateway not configured