Question 3: Mate

D

rial Requirement Planning

A company manufactures two products A and B. Each A requires twoC’s and one D. Each D requires two F’s and one E, while each Erequires one F. Each product B requires one D and two E’s. Thetable below shows data from the inventory records.

DATA CATEGORY C D E F
Lot-Sizing Rule Fixed Order Quantity = 220 Lot for Lot Fixed Order Quantity = 300 Period Order Quantity P = 2
Lead Time 3 weeks 2 weeks 3 weeks 2 weeks
Scheduled Receipts 280 (week 1) None 300 (week 3) None
Beginning Inventory 25 0 150 600

The MPS for product A calls for 85 units to be started in week 3and 100