Refer to the tablebelow. Assume that the company involved now finds that the learningrate is 80 percent. The 80 percent learning rate coefficient is-0.321928; that is b = -0.321928 in the formula Y= aXb.
Required:
Using the formula,Y = aXb, compute the labortime and costs for 5, 6, and 7 units. (Round yourintermediate calculations (except for coefficient) and finalanswers to 2 decimal places.)
________________________________________________________________________________________________________
unit produced——labor time required to produce the x thunit—–cumulative total time in labor———-totalcost——average cost
(x) (I,e. the last single unit produced)——- hrs.(2) (3) per unit (4)
_______________________________________________________________________________________________________
1. 100.00 100.00 5000.00 5000.00
_______________________________________________________________________________________________________
2. 80.00