Question 21

The following information is available for ABCManufacturing:

Standards:

Direct materials (2m @ R5)      R10

Direct labour (0.5h @ R10p/h) R5

Actual results for the year

Production       6000 units

Direct materials (11750m purchased andused)          R61 100

Direct labour (2 900 hours)      R29580

Management allows a 5% variance from standards

Spending variable overhead variance is the?

Select one:

a. Difference between the actual variable overhead rate and thestandard variable overhead rate

b. All of the options are correct

c. Actual price of the product and the standard price of theproduct

d. Spending overhead and the efficiency overhead

Question 22

The following information is available for ABCManufacturing:

Standards:

Direct materials (2m @ R5)      R10

Direct labour (0.5h @ R10p/h) R5

Actual results

OR

PayPal Gateway not configured

OR

PayPal Gateway not configured

Leave a Reply

Your email address will not be published. Required fields are marked *

Related Post

(Solved) : 2 Use Statement Complete Output Program Shown 51234 45123 34512 23451 12345 Q37892975 . . . .(Solved) : 2 Use Statement Complete Output Program Shown 51234 45123 34512 23451 12345 Q37892975 . . . .

pleaseuse devc++ to write this thanks<br/><img src="https://media.cheggcdn.com/media%2Fb94%2Fb943e8d7-6df2-4520-b771-6bf5e5e29ac7%2Fimage.png" alt="2) Use the for statement to complete the output of the program as shown below" aria-describedby="d3f"/><img src="https://media.cheggcdn.com/media%2Fa0b%2Fa0b7290b-c209-44db-b58b-02ce9f8db92a%2Fimage.png" alt="51234 45123 34512 23451 12345" aria-describedby="d3g"/>2)